Key Features:

  • One piece mandrel design provides a very robust tool design that withstands burst pressure in excess of 20,000 psi.

 

  • Port Jetting™ improves injectivity to formation.

 

  • Opening sequence is controlled by a fit for purpose rupture disc that is designed to resist plugging or bridging at the membrane.

 

  • Mandrel design maintains casing string integrity and yield torque ratings. The tool can be "through torqued" onto the casing string for ease of make up.

 

  • High torque casing connections for ease in matching any number of today's requirements.

 

  • Exceeds all safety and environmental standards.
Part Number Connection Size Max O.D. Min I.D. Make Up Length (ft) Temp. Rating ˚F Flow Area Torque Rating ft/lbs Working Pressure
TC-QS-450-0000 4.5 5.65 3.34 4 325˚ 6.8 15000 19000
TC-QS-450-0000-SE 4.5 5.65 3.34 4 375˚ 6.8 15000 19000
TC-QS-455-0000 5 5.65 3.34 4 325˚ 6.8 15000 19000
TC-QS-455-0000-SE 5 5.65 3.34 4 375˚ 6.8 15000 19000
TC-QS-551-0000 5.5 6.5 3.75 5.25 325˚ 7.5 20000 20000
TC-QS-551-0000-SE 5.5 6.5 3.75 5.25 375˚ 7.5 20000 20000
TC-QS-580-0000 5.5 7.38 4.6 4 325˚ 7.5 20000 20000
TC-QS-587-0000 5.5 7.38 4.67 4 325˚ 7.5 20000 20000
Green and White GEODynamics, Inc. logo
inject and frac valve logo

The GEODynamics QuickStart® Inject + Frac Valve provides the operator with an initial point to break down the formation and establishes a pump-in port for use in long horizontal completions. The device is comprised of an opening piston that is controlled by a special rupture disc.

The QuickStart® Frac Valve(s) are run as an integral part of the casing string and may be utilized in both cemented and uncemented well bores.

facebook logo LinkedIn logo YouTube logo
inject and frac valve logo
inject and frac valve logo

START YOUR

 COMPLETION OFF RIGHT

SmartStart PLUS®  Technology Time Delay + Frac Valve

QuickStart® Inject + Frac Valve

Competitor Toe Valve

✔︎

✔︎

Time Delay™  Technology

✔︎

✔︎

Time Delay for reliable multiple actuations

✔︎

✔︎

Port Jetting™  Technology

✔︎

✔︎

TORQ Thru™  Technology

✔︎

✔︎

Withstands burst pressure in excess of 20,000 psi

✔︎

Advanced Port Jetting™  Technology

✔︎

Time Delay Settings of 15, 30, 45, or 60 minutes

START YOUR

 COMPLETION OFF RIGHT

inject and frac valve logo

SmartStart PLUS® Time Delay + Frac Valve

QuickStart® Inject + Frac Valve

Competitors Toe Valve

✔︎

✔︎

Time Shift™ Technology

Time Delay for reliable multiple actuations

Port Jetting™ Technology

TORQ Thru™ Technology

Withstands burst pressure in excess  of 20,000 psi

Advanced Port Jetting™ Technology

Time Delay settings of 15, 30, 45,

or 60 minutes

The GEODynamics QuickStart® Inject + Frac Valve provides the operator with an initial point to break down the formation and establishes a pump-in port for use in long horizontal completions. The device is comprised of an Opening Piston that is controlled by a special rupture disc.

The QuickStart® Frac Valve(s) are run as an integral part of the casing string and may be utilized in both cemented and uncemented well bores.

Key Features:

  • One piece mandrel design provides a very robust tool design that withstands burst pressure in excess of 20,000 psi.

 

  • Port Jetting™ improves injectivity to formation.

 

  • Opening sequence is controlled by a fit for purpose rupture disc that is designed to resist plugging or bridging at the membrane.

 

  • Mandrel design maintains casing string integrity and yield torque ratings. The tool can be "through torqued" onto the casing string for ease of make up.

 

  • High torque casing connections for ease in matching any number of today's requirements.

 

  • Exceeds all safety and environmental standards.
Green and White GEODynamics, Inc. logo
inject and frac valve logo
inject and frac valve logo
inject and frac valve logo

The GEODynamics QuickStart® Inject + Frac Valve provides the operator with an initial point to break down the formation and establishes a pump-in port for use in long horizontal completions. The device is comprised of an Opening Piston that is controlled by a special rupture disc.

The QuickStart® Frac Valve(s) are run as an integral part of the casing string and may be utilized in both cemented and uncemented well bores.

START YOUR

 COMPLETION OFF RIGHT

Key Features:

  • One piece mandrel design provides a very robust tool design that withstands burst pressure in excess of 20,000 psi.

 

  • Port Jetting™ improves injectivity to formation.

 

  • Opening sequence is controlled by a fit for purpose rupture disc that is designed to resist plugging or bridging at the membrane.

 

  • Mandrel design maintains casing string integrity and yield torque ratings. The tool can be "through torqued" onto the casing string for ease of make up.

 

  • High torque casing connections for ease in matching any number of today's requirements.

 

  • Exceeds all safety and environmental standards.