fracdock

FRAC IT

AND FORGET IT

The patented FracDock™ Intervention-Free Frac Plug System is a replacement for composite bridge plugs in Plug and Perf operations.

System Advantages:

  • Designed to eliminate subsequent coiled tubing well intervention
  • Limited risk of premature plug setting
  • Largest ID frac plug on the market
  • Lowest cost solution available to the Operator
  • Can be ran with Baker & GO Style setting tools
  • 5 ½" - 3.668" can run 2 ⅞" tubing
  • 4 ½" - 3.063" can run 2 ⅜" tubing

The FracDock™ itself is designed in a manner to eliminate premature setting of the plugs, which is commonplace with the conventional composite frac plugs on the market today.

GEODynamics has a significant IP portfolio in this technology arena, both on the frac plug systems and proprietary ball systems. GEODynamics has extensive knowledge of the “disappearing ball” options available and has performed extensive testing of the products to help select the best commercially available ball for specific well conditions.

Competitora
frscdockseal
Competitorb

Specifications

SIZES OUTSIDE DIAMETER INSIDE DIAMETER UNCOMPRESSED LENGTH SET LENGTH DEF. PRESSURE RATING BALL DIAMETER FLOW AREA
5-1/2" 17 lb/ft 4.63" 4.02" 15.36" 9.85" 6000 psi 4.375" 12.69 in²
5-1/2" 20 lb/ft 4.50" 3.90" 15.36" 9.85" 6500 psi 4.25" 11.90 in²
5-1/2" 23 lb/ft 4.38" 3.77" 15.36" 9.85" 7000 psi 4.25" 11.16 in²
5-1/2" 26.8 lb/ft 4.29" 3.62" 15.28" 10.29" 8000 psi 4.125" 10.29 in²
SIZES OUTSIDE DIAMETER INSIDE DIAMETER UNCOMPRESSED LENGTH SET LENGTH DEF. PRESSURE RATING BALL DIAMETER FLOW AREA
4-1/2" 11.6 lb/ft 3.71" 3.11" 15.00" 9.67" 7500 psi 3.5" 7.60 in²
4-1/2" 13.0 lb/ft 3.63" 3.02" 15.12" 9.69" 9000 psi 3.375" 7.16 in²
4-1/2" 15.0 lb/ft 3.53" 2.93" 15.25" 9.69" TBD 3.375" 6.74 in²

US Patent No. 9,062,543 Other Patents Pending